Mājas ierīces
LG , Washing Machine with Dryer , F4DR711S2H , Energy efficiency class A , Front loading , Washing capacity 11 kg , 1400 RPM , Depth 56.5 cm , Width 60 cm , Display , LED , Drying system , Drying capacity 6 kg , Steam function , Direct drive , Wi-Fi , White
Kods: F4DR711S2H
| Cena | Skaits | Piegāde | |
|---|---|---|---|
726.48 € 600.40 € (bez PVN 21%) | 9 LTAE | 26.10. |
Mājas ierīces
Bosch Dishwasher , SMV4EMX71S , Built-in , Width 60 cm , Number of place settings 14 , Number of programs 6 , Energy efficiency class B , Display , AquaStop function , White
Kods: SMV4EMX71S
| Cena | Skaits | Piegāde | |
|---|---|---|---|
730.83 € 603.99 € (bez PVN 21%) | 26 LTAE | 26.10. |
Mājas ierīces
Bosch , Washing Machine , WGG254FVSN , Energy efficiency class A , Front loading , Washing capacity 10 kg , 1400 RPM , Depth 63 cm , Width 60 cm , Display , LED , Steam function , White
Kods: WGG254FVSN
| Cena | Skaits | Piegāde | |
|---|---|---|---|
734.47 € 607.00 € (bez PVN 21%) | 38 LTAE | 26.10. |
Mājas ierīces
Delonghi , Coffee maker , Rivelia EXAM440.55.W , Pump pressure 19 bar , Built-in milk frother , Fully Automatic , 1450 W , Arctic White
Kods: EXAM44055W
| Cena | Skaits | Piegāde | |
|---|---|---|---|
741.15 € 612.52 € (bez PVN 21%) | 6 LTAE | 26.10. |
Mājas ierīces
Whirlpool Dryer Machine , WP C8 WBS EE , Energy efficiency class C , Front loading , 8 kg , Digital , Depth 61 cm , Steam function , White
Kods: WP C8 WBS EE
| Cena | Skaits | Piegāde | |
|---|---|---|---|
747.07 € 617.41 € (bez PVN 21%) | 1 LTAE | 26.10. |
Mājas ierīces
Huawei , LUNA2000 Backup Box , Three-phasis , Backup Box-B1
Kods: 02406150
| Cena | Skaits | Piegāde | |
|---|---|---|---|
755.05 € 624.01 € (bez PVN 21%) | 7 LTAE | 26.10. |
Mājas ierīces
BEKO Refrigerator , B3RCNE564HXB , Energy efficiency class E , Free standing , Combi , Height 192 cm , No Frost system , Fridge net capacity 340 L , Freezer net capacity 150 L , Display , 39 dB , Stainless steel
Kods: B3RCNE564HXB
| Cena | Skaits | Piegāde | |
|---|---|---|---|
769.46 € 635.92 € (bez PVN 21%) | 3 LTAE | 26.10. |
Mājas ierīces
Xiaomi Mijia Front Load Washer Dryer Pro 10kg EU
Kods: QMP4696EU
| Cena | Skaits | Piegāde | |
|---|---|---|---|
770.77 € 637.00 € (bez PVN 21%) | 50 LTAE | 26.10. |
Mājas ierīces
Midea Refrigerator , MDRB542BIE70 , Energy efficiency class Class E , Free standing , Height 191 cm , Combi , No Frost system , Fridge net capacity 257 L , Freezer net capacity 135 L , Display , 38 dB , Grey
Kods: MDRB542BIE70
| Cena | Skaits | Piegāde | |
|---|---|---|---|
773.93 € 639.61 € (bez PVN 21%) | 24 LTAE | 26.10. |
Mājas ierīces
Whirlpool Oven , WOI6A8FPT1SBA , 73 L , Electric , Pyrolytic/Hydrolytic , Electronic , Steam function , Convection , Height 59.7 cm , Width 59.5 cm , Black
Kods: WOI6A8FPT1SBA
| Cena | Skaits | Piegāde | |
|---|---|---|---|
775.31 € 640.75 € (bez PVN 21%) | 2 LTAE | 26.10. |
Mājas ierīces
LG Dryer Machine , RHX1009NMB , Energy efficiency class C , Front loading , 9 kg , Heat pump , LED , Depth 66 cm , Wi-Fi , Middle Black
Kods: RHX1009NMB
| Cena | Skaits | Piegāde | |
|---|---|---|---|
785.94 € 649.54 € (bez PVN 21%) | 13 LTAE | 26.10. |
Mājas ierīces
DEYE ESS BOS-B Rack & Accessories , Deye
Kods: BOS-B-RACK&ACCESSORIES
| Cena | Skaits | Piegāde | |
|---|---|---|---|
786.74 € 650.20 € (bez PVN 21%) | 8 LTAE | 26.10. |